Specifications
Year2001
ManufacturerCIRRUS
ModelSR20
Serial Number1163
Registration #N222HW
ConditionUsed
FlightRulesIFR
Based atKFLL
Total Time2,600
AirframeAlways hangared
Engine 1 Make/ModelCONTINENTAL IO360
Engine 1 Time600 SMOH
Engine TBO2000
Prop ManufacturerHARTZELL
Prop ModelPHC-J3YF-1RF
Number of Blades3
Flight Deck Manufacturer/ModelGARMIN
Primary Flight Display 1 ManufacturerASPEN AVIONICS
GPS 1 ManufacturerGARMIN
GPS 1 ModelGNS430
GPS 2 ManufacturerGARMIN
GPS 2 ModelGNS420W
Transponder 1 ManufacturerGARMIN
Transponder 1 ModelGTX345
Autopilot ManufacturerS-TEC
Autopilot ModelSYSTEM 30
ADS-B EquippedYes
Engine MonitorYes
Avionics/RadiosAspen & JPI
Additional EquipmentVacuum Pump
Number of Seats4
InteriorComfortable seating for pilot and three passengers —ideal for personal and business travel.
Inspection StatusNext Annual Due July 2027
Fresh Magneto Overhaul
CAPS Parachute:
Cirrus Airframe Parachute System —next due April 2030
Rocket Assembly:
Parachute deployment rocket —next due June 2030
Line Cutters:
Parachute line cutter devices —due date to be confirmed at inspection
Year2001|
ManufacturerCIRRUS|
ModelSR20|
Serial Number1163|
Registration #N222HW|
ConditionUsed|
FlightRulesIFR|
Based atKFLL|
Total Time2,600|
AirframeAlways hangared|
Engine 1 Make/ModelCONTINENTAL IO360 |
Engine 1 Time600 SMOH |
Engine TBO2000|
Prop ManufacturerHARTZELL|
Prop ModelPHC-J3YF-1RF|
Number of Blades3|
Flight Deck Manufacturer/ModelGARMIN|
Primary Flight Display 1 ManufacturerASPEN AVIONICS|
GPS 1 ManufacturerGARMIN|
GPS 1 ModelGNS430|
GPS 2 ManufacturerGARMIN|
GPS 2 ModelGNS420W|
Transponder 1 ManufacturerGARMIN|
Transponder 1 ModelGTX345|
Autopilot ManufacturerS-TEC|
Autopilot ModelSYSTEM 30|
ADS-B EquippedYes|
Engine MonitorYes|
Avionics/RadiosAspen & JPI|
Additional EquipmentVacuum Pump|
Number of Seats4|
InteriorComfortable seating for pilot and three passengers —ideal for personal and business travel.|
Inspection StatusNext Annual Due July 2027
Fresh Magneto Overhaul
CAPS Parachute:
Cirrus Airframe Parachute System —next due April 2030
Rocket Assembly:
Parachute deployment rocket —next due June 2030
Line Cutters:
Parachute line cutter devices —due date to be confirmed at inspection|