Hutt Aviation is pleased to present this beautiful 1994 Learjet 31A. This Aircraft is turnkey and ready to fly. Currently active on our charter certificate and maintained FAR 135 standards.
Features an impeccable (8) eight passenger configuration (completed new as of December 2014) with entertainment system, Wi-Fi, Forward refreshment bar, and individual USB seat chargers.
Exterior Paint new as of January 2015. Always stored in a hangar and meticulously cared for. Contact Alan Gangwish at Hutt Aviation for more information on this executive aircraft.
Airframe
Total Time
7,287.2
Total Landings
5,987
Engine Program
Engine 1 Maintenance Program
None
Engine 1
Engine 1 Make/Model
HONEYWELL TFE731-2-3B
Engine 1 Time
7,014.9
Engine 1 Cycles Since Overhaul
5,972
Engine 1 Notes
CZI Compliance: Dec 2020
4013.7 Hrs Remain (+200)
MPI Compliance: Dec 2020
1213.7 Hrs Remain (+100)
Engine 2
Engine 2 Make/Model
HONEYWELL TFE731-2-3B
Engine 2 Time
7,127.7
Engine 2 Cycles Since Overhaul
6,074
Engine 2 Notes
CZI Compliance: May 2006
1176.9 Hrs Remain (+200)
MPI Compliance: Dec 2017
851.4 Hrs Remain (+100)
• Traxxall Maintenance Program
• Dee Howard TR-4000 Thrust Reversers
• N1 Digital Electronic Engine Computers (DEEC)
• 36-Inch Main Entrance Door
• Single Point Refueling
• Solid State Data Transfer Unit (DTU)
• Dual BF Goodrich PS-835D Emergency Power Supply Units
• Dual Bendix/King KST-488 Speed / Temperature Displays
• Dual Bendix/King KDX-481T Air data Computers
• Triple Bendix/King SG-465 Symbol Generators
• RVSM Capable
• WIFI Airtext
Exterior
Year Painted
2015
Exterior
• Matterhorn White, Atomic Red, and Coronet Gold (Completed January 2015)
Interior
Interior
• Impeccable Eight (8) Passenger Executive Garrett Avion Antler with Berkshire
Espresso. ( Completed December 2014)
• Individual USB Seat Chargers
• Large 41 Cubic Foot Luggage Compartment
• Forward Refreshment Bar
• Entertainment System
• Lavatory
Inspection Status
Inspection Status
• Phase A Inspection (12 Month) Due February 2027
• Phase B Inspection (24 Month) Due February 2028
• Phase C Inspection (48 Month) Due April 2027
• Phase D Inspection (96 Month) Due April 2031
• Twelve (12) Year Airframe Inspection Due June 2030
• Major Landing Gear Inspection C/W February 2024
This monthly repayment estimate is provided by Overdrive Commercial Funding Pty Ltd (Australian Credit License: 389328) This estimate is based on a Chattel Mortgage, which is only available where the purchaser of the item intends to use the item for primarily commercial use. The term of this loan is based 60 months with 30% residual & subject to qualifying commercial assets and credit criteria. Fees and charges are not included in this estimate and may apply. If the item is a vehicle and is not listed with a drive away price, any repayment estimate does not include additional costs, such as stamp duty and other government charges. The term of this loan is 60 months. This estimate should be used for information purposes only and is not an offer of finance on particular terms. This repayment estimate is the estimated lowest repayment available from Overdrive Commercial Funding Pty Ltd’s panel of lenders and products for this specific item each day, and includes several assumptions about the item, purchaser, and loan specifics. All loans are subject to eligibility criteria and Overdrive Commercial Funding Pty Ltd loan approval process. A specific quote including details of all fees and charges, or loans for items with primarily or wholly personal use can be obtained via overdrivefunding.com.au or by calling 1800 954 124.
Your current browser cannot run our content, please make sure your browser is fully updated or try one of the browsers below.