Call for price
Aircraft Location:Westerham, England, United Kingdom
Seller Information
View Seller InformationGeneral
Year
1992
Manufacturer
Model
Serial Number
063
Condition
Used
Registration #
N160RM
FlightRules
IFR
Based at
LFHV
Description
TBM 700 A model with a recent engine (only 1,500 hours since OVH - TBO at 3,500 hours)
No damage history.
Step up to the turbine world at an attractive price and enjoy the high levels on the super light edition of the TBM!
Very well maintained TBM 700A by Daher HQ factory service station.
Recent windshields, deice boots, radar, starter generator, flap motor.
Airframe life extension SB applied.
Daher maintained from 1992 to 2000 with letter to certify no damage history from their service center director. All logbooks from 2000 until 2026.
Great speed and short field performance
Airframe
Total Time
5,100
Max Takeoff Weight
2,984 kg
Complete Logs
Yes
Engine Program
Engine 1 Maintenance Program
Other
Engine 1
Engine 1 Make/Model
PRATT & WHITNEY PT6A-64
Engine 1 Time
1,500 SMOH
Engine 1 TBO
3500
Avionics
Flight Deck Manufacturer/Model
GARMIN G600 TXI
Avionics/Radios
GARMIN PFD G600TXI
GARMIN GFC600 AUTOPILOT
GARMIN STANDBY INSTRUMENT
GTN750Xi
GTN 650
WX 500 Stormscope with indicator and output
to the MFD
KNI 582 RMI Indicator connected to heading nº2
DME KN 63 with output to the EHSI
GARMIN GTS 800 Traffic to G600TXI et GTN 750Xi
GARMIN 330ES transponder
Yaw damper with Symbol Generator
Honeywell Altimeter
Stand-by vacuum Artificial horizon
406 MHz ELT
Shadin ETM Engine Trend Monitor.
Honeywell Enhanced Ground Proximity
Warning
System (EGPWS)
Additional Equipment
Pressurized
Yes
Flight Into Known Icing (FIKI)
Yes
Service Logs
Miscellaneous

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

Get Financing