2008 BOMBARDIER CHALLENGER 605
説明
Highlights:
December 2023 Paint and Interior
Enrolled on Smart Parts, Engines, APU Programs
Pro Line 21 Advanced System and FANS
Collins VENUE HD CMS
Gogo L5 Avance WiFi仕様
年式2008
メーカーBOMBARDIER
モデルCHALLENGER 605
シリアル番号5723
状態中古
Total Time10,576
Total Landings6,098
Max Takeoff Weight21,863.15 kg
Max Landing Weight17,236.51 kg
Max Zero Fuel Weight14,514.96 kg
Basic Empty Weight12,035.62 kg
Maintenance TrackingCamp
Engine 1 Maintenance ProgramOnPoint
Engine 1 Make/ModelGENERAL ELECTRIC CF34-3B
Engine 1 Serial Number950595
Engine 1 Time10,578 SNEW
Engine 1 Cycles6,170
Engine 2 Make/ModelGENERAL ELECTRIC CF34-3B
Engine 2 Serial Number950492
Engine 2 Time10,587 SNEW
Engine 2 Cycles6,136
APUはい
APU Time11,653
APU Maintenance ProgramMSP
APU NotesHoneywell GTCP 36-150(CL)
S/N P-170
Flight Deck Manufacturer/ModelROCKWELL COLLINS PRO LINE 21 ADVANCED
FANSはい
WAASはい
RNPはい
CPDLCはい
Avionics/RadiosCollins Pro Line 21 Advanced System (SB 605-34-019) Includes:
Four Collins Adaptive Flight Displays
Dual Collins ADC-850E Air Data Computers
Dual Collins DCU-4002 Data Concentrator Units
Engine Instrument/Crew Alerting System (EICAS)
Collins WXR-854 Color Weather Radar
Dual Collins GPS-4000S GPS w/ WAAS (SB 605-34-011)
Dual Collins NAV-4000 Nav Units w/ FM Immunity
Dual Collins VHF-4000 Comm System w/8.33 KHz with third VHF
(SB 605-23-001) and Datalink (SB 605-23-002)
Dual Collins DME-4000 DME
Collins TTR-4000 TCAS II w/change 7.1 (SB 605-34-018)
Dual Collins TDR-94D Mode S Transponders with ADS-B Out V2 (SB 605-34-030)
Collins ALT-4000 Radio Altimeter
Wifiはい
Additional EquipmentRVSM, MNPS, RNP 1/2/4/10 Capable
FANS -1/A CPDLC
Honeywell Mark V EGPWS w/ RAAS
ICS-220A Iridium Satellite Communication System (SB 605-23-011)
Take Off Safety Enhancement (SB 605-30-001)
Aircraft Health Management System (SB605-46-005)
FA2100 120 Minute Cockpit Voice Recorder
FA2100 25 Hour Flight Data Recorder
Cockpit Voice Recorder Independent Power Supply (RIPS) (SB 605-23-006)
Artex C406-N MHz ELT
Gogo L5 Avance Wifi (STC ST01863WI)
Collins Venue HD Cabin Management System
Year Painted2023
ExteriorFull strip and repaint at BAS Tucson, December 2023.
Aircraft is all Matterhorn White.
Year Interior2023
InteriorNew interior November 2023 at Bombardier. TCCA, FAA and EASA STC. All new soft goods including cabin and crew seat leather, plating, countertops, cabin and cockpit carpet, entry way/galley and lavatory vinyl flooring, sidewalls, dados, headliners, window shades, and curtains. Newly refinished hardwood cabinetry throughout the aircraft. Jump seat is for crew use only. The forward cabin features four (4) executive seats with two (2) pull out tables. The aft LH cabin features a four (4) place conference group with table opposite a belted four (4) place divan on RH side. Location of galley is forward, lavatory is aft, and the baggage compartment is located aft of the lavatory.
Inspection Status12M Inspection: Last DEC 2025 / Due DEC 2026
24M Inspection: Last DEC 2024 / Due DEC 2026
36M Inspection: Last DEC 2024 / Due DEC 2027
48M Inspection: Last DEC 2023 / Due JUL 2027
96M Inspection: Last DEC 2023 / Due JUL 2031
192M Inspection: Last AUG 2023 / Due JUL 2039
Landing Gear: Last 2023 / Due 2031
年式2008|
メーカーBOMBARDIER|
モデルCHALLENGER 605|
シリアル番号5723|
状態中古|
Total Time10,576|
Total Landings6,098|
Max Takeoff Weight21,863.15 kg|
Max Landing Weight17,236.51 kg|
Max Zero Fuel Weight14,514.96 kg|
Basic Empty Weight12,035.62 kg|
Maintenance TrackingCamp|
Engine 1 Maintenance ProgramOnPoint|
Engine 1 Make/ModelGENERAL ELECTRIC CF34-3B |
Engine 1 Serial Number950595|
Engine 1 Time10,578 SNEW |
Engine 1 Cycles6,170|
Engine 2 Make/ModelGENERAL ELECTRIC CF34-3B |
Engine 2 Serial Number950492|
Engine 2 Time10,587 SNEW |
Engine 2 Cycles6,136|
APUはい|
APU Time11,653|
APU Maintenance ProgramMSP|
APU NotesHoneywell GTCP 36-150(CL)
S/N P-170|
Flight Deck Manufacturer/ModelROCKWELL COLLINS PRO LINE 21 ADVANCED |
FANSはい|
WAASはい|
RNPはい|
CPDLCはい|
Avionics/RadiosCollins Pro Line 21 Advanced System (SB 605-34-019) Includes:
Four Collins Adaptive Flight Displays
Dual Collins ADC-850E Air Data Computers
Dual Collins DCU-4002 Data Concentrator Units
Engine Instrument/Crew Alerting System (EICAS)
Collins WXR-854 Color Weather Radar
Dual Collins GPS-4000S GPS w/ WAAS (SB 605-34-011)
Dual Collins NAV-4000 Nav Units w/ FM Immunity
Dual Collins VHF-4000 Comm System w/8.33 KHz with third VHF
(SB 605-23-001) and Datalink (SB 605-23-002)
Dual Collins DME-4000 DME
Collins TTR-4000 TCAS II w/change 7.1 (SB 605-34-018)
Dual Collins TDR-94D Mode S Transponders with ADS-B Out V2 (SB 605-34-030)
Collins ALT-4000 Radio Altimeter|
Wifiはい|
Additional EquipmentRVSM, MNPS, RNP 1/2/4/10 Capable
FANS -1/A CPDLC
Honeywell Mark V EGPWS w/ RAAS
ICS-220A Iridium Satellite Communication System (SB 605-23-011)
Take Off Safety Enhancement (SB 605-30-001)
Aircraft Health Management System (SB605-46-005)
FA2100 120 Minute Cockpit Voice Recorder
FA2100 25 Hour Flight Data Recorder
Cockpit Voice Recorder Independent Power Supply (RIPS) (SB 605-23-006)
Artex C406-N MHz ELT
Gogo L5 Avance Wifi (STC ST01863WI)
Collins Venue HD Cabin Management System|
Year Painted2023|
ExteriorFull strip and repaint at BAS Tucson, December 2023.
Aircraft is all Matterhorn White.|
Year Interior2023|
InteriorNew interior November 2023 at Bombardier. TCCA, FAA and EASA STC. All new soft goods including cabin and crew seat leather, plating, countertops, cabin and cockpit carpet, entry way/galley and lavatory vinyl flooring, sidewalls, dados, headliners, window shades, and curtains. Newly refinished hardwood cabinetry throughout the aircraft. Jump seat is for crew use only. The forward cabin features four (4) executive seats with two (2) pull out tables. The aft LH cabin features a four (4) place conference group with table opposite a belted four (4) place divan on RH side. Location of galley is forward, lavatory is aft, and the baggage compartment is located aft of the lavatory.|
Inspection Status12M Inspection: Last DEC 2025 / Due DEC 2026
24M Inspection: Last DEC 2024 / Due DEC 2026
36M Inspection: Last DEC 2024 / Due DEC 2027
48M Inspection: Last DEC 2023 / Due JUL 2027
96M Inspection: Last DEC 2023 / Due JUL 2031
192M Inspection: Last AUG 2023 / Due JUL 2039
Landing Gear: Last 2023 / Due 2031|