Print
    1991 CESSNA CITATION II Used Jet Aircraft1991 CESSNA CITATION II Used Jet Aircraft
    1991 CESSNA CITATION II Used Jet Aircraft1991 CESSNA CITATION II Used Jet Aircraft
    1991 CESSNA CITATION II Used Jet Aircraft1991 CESSNA CITATION II Used Jet Aircraft
    1991 CESSNA CITATION II Used Jet Aircraft1991 CESSNA CITATION II Used Jet Aircraft
    1991 CESSNA CITATION II Used Jet Aircraft1991 CESSNA CITATION II Used Jet Aircraft
    1991 CESSNA CITATION II Used Jet Aircraft1991 CESSNA CITATION II Used Jet Aircraft
    1991 CESSNA CITATION II Used Jet Aircraft1991 CESSNA CITATION II Used Jet Aircraft
    1991 CESSNA CITATION II Used Jet Aircraft1991 CESSNA CITATION II Used Jet Aircraft
    Photos(8)

    1991 CESSNA CITATION II

    価格はお問い合わせください 

    売主に関する情報

    View Seller Information

    Red Sky Group LLC

    お問い合わせ先:Jose Hernandez Ortiz

    電話番号:+52 55 8618 6576

    Toluca, メキシコ

    General

    年式
    1991
    メーカー
    モデル
    状態
    中古
    Based at
    LOS CABOS, BAJA CALIFORNIA SUR, MÉXICO
    説明
    1981 Cessna 550 Citation II with 9,282.1 hours total time. Engine 1 has 2,101.8 hours TSO with 1,398.2 hours remaining to overhaul. Engine 2 has 2,577.7 hours TSO with 922.3 hours remaining to overhaul. Complete Phase 1 through 5 inspections are current, with multiple additional phase inspections completed. Minor engine inspections are current on both engines. New fuselage windows installed, overhauled RH flap motor and RH MLG actuator, repaired LH flap motor, overhauled LH brake assembly, and new main cabin door weather seal. All FAA AD's reviewed and complied with. Sherwin Williams Aerospace paint completed May 2026.

    Airframe

    Total Time
    9,310.3
    Total Landings
    7,972

    Engine Program

    Engine 1 Maintenance Program
    None

    Engine 1

    Engine 1 Make/Model
    PRATT & WHITNEY JT15D-4
    Engine 1 Time
    9,001 SNEW
    Engine 1 TBO
    3500
    Engine 1 Cycles
    7,602
    Hot Section Time 1
    351
    Engine 1 Notes
    Complete Phase 1 through 5 inspections current. Phase 18, 20, 21, 22, 34, 55, 56, 57 and 61 completed. Minor engine inspections current on both engines. All FAA AD's reviewed and complied with.

    Engine 2

    Engine 2 Make/Model
    PRATT & WHITNEY JT15D-4
    Engine 2 Time
    10,672 SNEW
    Engine 2 TBO
    3500
    Engine 2 Cycles
    8,398
    Hot Section Time 2
    707.3

    Avionics

    Flight Deck Manufacturer/Model
    HONEYWELL PRIMUS 1000

    Exterior

    Year Painted
    2026

    Inspection Status

    Inspection Status
    Complete Phase 1 through 5 inspections current. Phase 18, 20, 21, 22, 34, 55, 56, 57 and 61 completed. Minor engine inspections current on both engines. All FAA AD's reviewed and complied with.
    Aircraft Cost Calculator Summary

    Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App

    Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.

    Get Aircraft Operating Cost Reports Now

    • Detailed Aircraft Information
    • Aircraft Performance Data
    • Payment Schedule
    • Annual Fixed Costs
    • Annual Variable Costs
    • Hourly Cost Analysis
    • Annual / Monthly Budgets
    Aircraft Cost Calculator Report