2007 BOMBARDIER GLOBAL 5000
説明
The only 2007 Global 5000 with 240-month inspection completed!
Custom VVIP interior
2021 new paint and 2019 interior refurbishment
Engines, APU and Airframe under Programs
High SB Status & Private Operation since Delivery
Rockwell Venue CMS Upgrade仕様
年式2007
メーカーBOMBARDIER
モデルGLOBAL 5000
シリアル番号9198
状態中古
Based atSIN
Total Time5,258
Total Landings1,859
Range5,400 Nm
Wingletsはい
Maintenance TrackingCamp
Parts Maintenance ProgramSMART PARTS
Engine 1 Maintenance ProgramCorporateCare Enhanced
Engine 1 Make/ModelROLLS ROYCE BR710
Engine 1 Time5,145 SNEW
Engine 1 Cycles Since Overhaul1,829
Engine 1 On Conditionはい
Engine 2 Make/ModelROLLS ROYCE BR710
Engine 2 Time5,172 SNEW
Engine 2 Cycles Since Overhaul1,824
Engine 2 On Conditionはい
APUはい
APU Time4,815
APU Maintenance ProgramMSP Gold
Flight Deck Manufacturer/ModelROCKWELL COLLINS
ADS-B Equippedはい
FANSはい
WAASはい
LPVはい
RNPはい
SVTはい
CPDLCはい
EVSはい
Year Painted2021
ExteriorNew paint at Bombardier
Year Interior2019
Number of Seats13
Galleyはい
Galley ConfigurationForward
Lavatoryはい
Lavatory ConfigurationForward and Aft
InteriorInterior refurbishment in 2019 with Rockwell Venue CMS Upgrade
Inspection Status240-month inspection completed by Bombardier Singapore in March 2026
Airworthyはい
年式2007|
メーカーBOMBARDIER|
モデルGLOBAL 5000|
シリアル番号9198|
状態中古|
Based atSIN|
Total Time5,258|
Total Landings1,859|
Range5,400 Nm|
Wingletsはい|
Maintenance TrackingCamp|
Parts Maintenance ProgramSMART PARTS|
Engine 1 Maintenance ProgramCorporateCare Enhanced|
Engine 1 Make/ModelROLLS ROYCE BR710 |
Engine 1 Time5,145 SNEW |
Engine 1 Cycles Since Overhaul1,829|
Engine 1 On Conditionはい|
Engine 2 Make/ModelROLLS ROYCE BR710 |
Engine 2 Time5,172 SNEW |
Engine 2 Cycles Since Overhaul1,824|
Engine 2 On Conditionはい|
APUはい|
APU Time4,815|
APU Maintenance ProgramMSP Gold|
Flight Deck Manufacturer/ModelROCKWELL COLLINS|
ADS-B Equippedはい|
FANSはい|
WAASはい|
LPVはい|
RNPはい|
SVTはい|
CPDLCはい|
EVSはい|
Year Painted2021|
ExteriorNew paint at Bombardier|
Year Interior2019|
Number of Seats13|
Galleyはい|
Galley ConfigurationForward|
Lavatoryはい|
Lavatory ConfigurationForward and Aft|
InteriorInterior refurbishment in 2019 with Rockwell Venue CMS Upgrade|
Inspection Status240-month inspection completed by Bombardier Singapore in March 2026|
Airworthyはい|