Aircraft based and registered in Brazil.
All maintenance is tracked on CAMP Systems.
Will be delivered w/ Fresh 4C Check and Landing Gear Overhaul.
Engines Program: Honeywell CSP GOLD Program.
APU Program: Honeywell MSP Program.
Avionics Program: Collins CASP Program.
Equipped w/ Collins PRO-LINE 21, FANS-1/A, CPDLC, WAAS/LPV, ADS-B, TCAS 7.1. and API WINGLETS.
Executive interior configured for 10 passengers + 3 crew.
No accident or incident history.
Always kept in hangar.
Airframe
Total Time
4,651
Total Landings
3,205
Winglets
Yes
Maintenance Tracking
Camp
Engine Program
Engine 1 Maintenance Program
CSP Gold
Engine 1
Engine 1 Make/Model
HONEYWELL CFE738-1-1B
Engine 1 Time
4,305 SNEW
Engine 1 Cycles Since Overhaul
2,959
Engine 2
Engine 2 Make/Model
HONEYWELL CFE738-1-1B
Engine 2 Time
4,596 SNEW
Engine 2 Cycles Since Overhaul
3,176
Auxiliary Power Unit
APU
Yes
APU Time
4,160
APU Maintenance Program
MSP
APU Notes
Honeywell GTCP36-150
Avionics
Avionics/Radios
COLLINS PRO-LINE 21 UPGRADED FLIGHT DECK
Four (4) Pro Line 21 Displays EFIS
FANS-1/A / CPDLC
WAAS / LPV
Dual Collins ADC-850C Air Data Computers (ADC)
Dual Honeywell Laser Ref IV Inertial Reference Systems (IRS)
Collins AHS-85E AHRS
Dual Collins VHF-422C VHF COMMs w/ 8.33 KHz Spacing
Dual Collins HF-9034A with SELCAL
Dual Collins VIR-432 NAVs with FM Immunity
Dual Collins-6100 FMS
Dual Collins TDR 94D Transponders w/ Enhanced Mode S (ADS-B OUT)
Collins TCAS-4000 w/ Change 7.1
Honeywell Mark V EGPWS with Windshear Alert
Dual Collins ADF-462 ADFs
Dual Collins DME-442 DMEs
Collins ALT-55B Radio Altimeter
Collins TWR-850 Weather Radar with Turbulence Detection
Collins DBU-5010 Data Loader
MNPS, RNP-10, PRNAV, BRNAV & RVSM
Additional Equipment
Additional Equipment
API WINGLETS
Dual File Servers (Paperless Cockpit)
EVAS (Emergency Vision Assurance System)
FDR and CVR
XM Weather
Aircell Access Iridium In-flight Phone
Airshow 4000
iPad connectivity for music and video
Two 19” wide cabin monitors
LED Interior cabin lighting
Gross Weight Increase Mod
“Dry Bay” Mod completed
Electric Main Entrance Door
Interior
Year Interior
2024
Modifications/Conversions
Modifications/Conversions
Gross Weight Increase Mod
“Dry Bay” Mod completed
Inspection Status
Inspection Status
All maintenance is tracked on CAMP Systems.
Will be delivered w/ Fresh 4C Check and Landing Gear Overhaul.
This monthly repayment estimate is provided by Overdrive Commercial Funding Pty Ltd (Australian Credit License: 389328) This estimate is based on a Chattel Mortgage, which is only available where the purchaser of the item intends to use the item for primarily commercial use. The term of this loan is based 60 months with 30% residual & subject to qualifying commercial assets and credit criteria. Fees and charges are not included in this estimate and may apply. If the item is a vehicle and is not listed with a drive away price, any repayment estimate does not include additional costs, such as stamp duty and other government charges. The term of this loan is 60 months. This estimate should be used for information purposes only and is not an offer of finance on particular terms. This repayment estimate is the estimated lowest repayment available from Overdrive Commercial Funding Pty Ltd’s panel of lenders and products for this specific item each day, and includes several assumptions about the item, purchaser, and loan specifics. All loans are subject to eligibility criteria and Overdrive Commercial Funding Pty Ltd loan approval process. A specific quote including details of all fees and charges, or loans for items with primarily or wholly personal use can be obtained via overdrivefunding.com.au or by calling 1800 954 124.
Your current browser cannot run our content, please make sure your browser is fully updated or try one of the browsers below.