1980 BEECHCRAFT KING AIR C90
Beschreibung
BLACKHAWK CONVERSION, Phases 1-4 inspections 2/2024 - MAKE OFFERSpezifikation
Jahr1980
HerstellerBEECHCRAFT
ModellKING AIR C90
SeriennummerLJ-0923
ZustandGebraucht
Registration #N385EM
FlightRulesIFR
Based atKCTJ
Total Time9,467
Total Landings9,601
Complete LogsJa
Landing Gear OverhaulJa
Landing Gear Cycles Since Overhaul2,019
Engine 1 Make/ModelPRATT & WHITNEY PT6A-135A
Engine 1 Serial NumberPCE-PZ0188
Engine 1 Time3,942 SNEW
Engine 1 TBO4000
Hot Section Time 1 835
Engine 1 NotesPT6A-135A installed by Blackhawk Modifications Inc. (since new engines)
Engine 2 Make/ModelPRATT & WHITNEY PT6A-135A
Engine 2 Serial NumberPCE-PZ0189
Engine 2 Time3,942 SNEW
Hot Section Time 2835
Engine 2 NotesPT6A-135A installed by Blackhawk Modifications Inc. (since new engines)
Propeller 1-Zeit1654 SMOH
Propeller 2-Zeit1361 SMOH
Anzahl der Messer4
Prop SpecsHartzell 4 Blade Props
Left propeller: overhauled Sept 27, 2016 1654.9 SPOH Sn FY3206
Right propeller: overhauled Aug 30, 2018 1361SMOH Sn FY4749
Avionics/RadiosGarmin G600NXI Pilot side
G600 Autopilot
GTN 750
GTN 650
Garmin Radar
Dual Garmin Transponders ADSB Out
unter DruckJa
Oxygen System0.62 m3
Schutz gegen überraschende VereisungJa
Additional EquipmentCabin Air Conditioning , New AC unite
Dual Heated Windshields
22 CU Ft. Oxygen System
Dual Cabin Tables
Lavatory Dual Sliding Doors
Polarized Interior Windows
Engine Sync. (not in service)
Auto Feather
TAWS
Year Painted2026
ExteriorNew paint underway
Year Interior2018
Number of Seats5
ConfigurationPassenger
GalleyJa
Galley ConfigurationForward
LavatoryJa
Lavatory ConfigurationAft
InteriorAll new interior underway. Club seating arrangement in grey leather, with fold out card tables. Aft belted lav. Double lanyard entrance door cables.
Inspection StatusLanding Gear: Overhauled 2019
• Phases 1-4 inspections March 2024
* Phases 1 & 2 Underwasy
• 9000 cycle fuselage inspection per 53-10-00, figure 601
• outflow and safety valve cleaning
• L & R pneumatic filter cleaning
• L & R Chip detector continuity checks
• L & R fuel filter replacement
• igniters inspection
• L & R engine mount isolators inspection, New Engine Mounts
• L & R flow control solenoid filters cleaning
• Instrument filter replacement
• Pressurization control filter replacement and housing cleaning
• 200 hour lubrication
• L & R starter/generator brush checks
• Boots in very good condition
Jahr1980|
HerstellerBEECHCRAFT|
ModellKING AIR C90|
SeriennummerLJ-0923|
ZustandGebraucht|
Registration #N385EM|
FlightRulesIFR|
Based atKCTJ|
Total Time9,467|
Total Landings9,601|
Complete LogsJa|
Landing Gear OverhaulJa|
Landing Gear Cycles Since Overhaul2,019|
Engine 1 Make/ModelPRATT & WHITNEY PT6A-135A |
Engine 1 Serial NumberPCE-PZ0188|
Engine 1 Time3,942 SNEW |
Engine 1 TBO4000|
Hot Section Time 1 835|
Engine 1 NotesPT6A-135A installed by Blackhawk Modifications Inc. (since new engines)|
Engine 2 Make/ModelPRATT & WHITNEY PT6A-135A |
Engine 2 Serial NumberPCE-PZ0189|
Engine 2 Time3,942 SNEW |
Hot Section Time 2835|
Engine 2 NotesPT6A-135A installed by Blackhawk Modifications Inc. (since new engines)|
Propeller 1-Zeit1654 SMOH |
Propeller 2-Zeit1361 SMOH |
Anzahl der Messer4|
Prop SpecsHartzell 4 Blade Props
Left propeller: overhauled Sept 27, 2016 1654.9 SPOH Sn FY3206
Right propeller: overhauled Aug 30, 2018 1361SMOH Sn FY4749|
Avionics/RadiosGarmin G600NXI Pilot side
G600 Autopilot
GTN 750
GTN 650
Garmin Radar
Dual Garmin Transponders ADSB Out|
unter DruckJa|
Oxygen System0.62 m3|
Schutz gegen überraschende VereisungJa|
Additional EquipmentCabin Air Conditioning , New AC unite
Dual Heated Windshields
22 CU Ft. Oxygen System
Dual Cabin Tables
Lavatory Dual Sliding Doors
Polarized Interior Windows
Engine Sync. (not in service)
Auto Feather
TAWS|
Year Painted2026|
ExteriorNew paint underway|
Year Interior2018|
Number of Seats5|
ConfigurationPassenger|
GalleyJa|
Galley ConfigurationForward|
LavatoryJa|
Lavatory ConfigurationAft|
InteriorAll new interior underway. Club seating arrangement in grey leather, with fold out card tables. Aft belted lav. Double lanyard entrance door cables.|
Inspection StatusLanding Gear: Overhauled 2019
• Phases 1-4 inspections March 2024
* Phases 1 & 2 Underwasy
• 9000 cycle fuselage inspection per 53-10-00, figure 601
• outflow and safety valve cleaning
• L & R pneumatic filter cleaning
• L & R Chip detector continuity checks
• L & R fuel filter replacement
• igniters inspection
• L & R engine mount isolators inspection, New Engine Mounts
• L & R flow control solenoid filters cleaning
• Instrument filter replacement
• Pressurization control filter replacement and housing cleaning
• 200 hour lubrication
• L & R starter/generator brush checks
• Boots in very good condition|